editWe are pleased to bring you the Wikimedia Foundation’s Quarterly Report for Q1 of the 2015/16 fiscal year, a comprehensive summary of how we did on the objectives defined earlier in our quarterly goal setting process. We are continuing to optimize the report’s format and the organization’s quarterly review process based on the feedback that we have received.
This issue includes some new pieces of information and a few format changes. Teams have been starting to highlight one key performance indicator (KPI) each - with ongoing efforts to identify the best possible metrics - and to estimate how much time fell into each of the three categories from the 2015 Call to Action (strengthen, focus and experiment). We have reorganized the content to present all the information that is related to a particular objective in one place (description of the goal, measures of success, how we did on achieving the objective, and what we learned from working on it), and changed these slides to a cleaner, more effective layout.
As before, we are including an overview slide summarizing successes and misses across all teams. In a mature 90-day goal setting process, the “sweet spot” is for about 75% of goals to be a success. Organizations that are meeting 100% of their goals are not typically setting aggressive goals.
Terry Gilbey, Chief Operating Officer
Quarterly metrics scorecard (beta)
editParticipation | ||
Active editors (5+ edits/month, July-August) |
75.2k/mo | -4.7% from Q4 -0.7% y-o-y |
New editor activation (top 5 Wikipedias) |
6.1% | +38% from Q4 +45% y-o-y |
Edits via mobile (on WP, percentage of total) |
3.0% | Q4: 2.0% Q1 2014-15: 1.5% |
Site reliability | ||
Read uptime | 99.942% | -0.002% from Q4 (May-June) y-o-y: N/A |
Write uptime | 99.935% | -0.007% from Q4 (May-June) y-o-y: N/A |
Read latency Median first paint time |
1.1 seconds | Q4: 1.3 seconds |
Write latency Median page save time |
1.0 seconds | Q4: 1.6 seconds |
Readership | ||
Page Views Crawlers excluded |
15.3B/mo | -12.5% from Q4 approx. -7% y-o-y |
Content | ||
New articles | 7.6k/day | +14.8% from Q4 -43.5% y-o-y |
Edits (in WP articles) | 11.6M/mo | +0.8% from Q4 +13.4% y-o-y |
Fundraising | ||
Amount raised | $7.9M (missed $8M target) |
-$3.6M from Q4 -$3.6M y-o-y |
On mobile | 12% | Q4: 10% |
3
Q1 2015/16: Successes/misses by team
editQ1 2015/16 objectives overall
133 objectives
36 teams
- 81 successes (61%)
- 52 misses (39%)
Misses include anything not delivered as planned, including “yellow” goals and those that were intentionally revised or abandoned due to changing priorities.
Community Engagement
editQuarterly review
Q1 - CE Department
Objective | Measure of success | Status |
Goal 1. FOCUS: Define overall strategy and prioritize current work into the available resources |
|
Projects on MPL, and gaps mapped (informally) as part of strategy.
|
Q1 - CE Department
Objective | Measure of success | Status |
Goal 2. STRENGTHEN community health |
|
Successful. Details in each team’s report. |
Q1 - CE Department
Objective | Measure of success | Status |
Goal 3. STRENGTHEN support of other WMF departments |
|
Product development process was not successful.
|
Q1 - CE Department
Objective | Measure of success | Status |
Goal 4. EXPERIMENT with new community tools and approaches |
|
Successful. Details in each team’s report. |
Q1 - CE Department
Objective | Measure of success | Status |
Goal 4. EXPERIMENT with new community tools and approaches |
|
Global ban enforcement experiments were deprioritized.
Other experiments were mostly successful; details in each team’s report. |
Q1 - CE Department
Objective | Measure of success | Status |
Goal 5. CORE: support existing workflows. |
|
Successful. Details in each team’s report. |
Developer Relations
editQuarterly review
Key performance indicator
Users of Wikimedia Web APIs | N/A (T102079) | N/A from Q4 | N/A YoY |
Q1 - Developer Relations
Objective | Measure of success | Status |
Goal 1: EXPERIMENT
First Wikimania Hackathon fully integrated with the main program and the editor community
|
Hackathon Showcase features at least 8 demos produced at the event in front of a mixed audience of developers and editors.
|
23 hackathon projects showcased on Wikimania’s first official day.
|
Volunteer Siebrand Mazeland was a very helpful co-organizer supporting Rachel Farrand.
A smaller Hackathon space was available during all Wikimania, hosting small meetings and work.
Survey: 87% of participants had a positive/very positive experience, 0% negative/very negative.
Q1 - Developer Relations
Objective | Measure of success | Status |
Goal 2: EXPERIMENT
Integrate the new Web APIs Hub with mediawiki.org
|
New Web APIs bub available in mediawiki.org with basic content and coherent user experience.
|
New Web APIs hub is ready for 3rd party developers.
|
S Page (previously in Engineering Community) was on loan from Reading to work on this goal.
Volker Eckl (Reading Design) went beyond call of duty volunteering many fixes to Blueprint skin.
Plan to keep writing documentation based on explicit needs from developers using our APIs.
UX refresh priority demoted as long as UX resources are not committed.
Q1 - Developer Relations
Objective | Measure of success | Status |
Goal 3: STRENGTHEN
Organize a Gerrit Cleanup Day
|
All WMF developer teams join the Day.
|
All WMF developer teams using Gerrit participated, although with different degrees of engagement.
|
We committed to the goal of 100% without a calculator; we are still happy about the 18%-24%.
Lessons learned are on their way, but first impression is that the experience was positive and it helps sensibilizing our teams and our technical community about improving our code review practices.
Q1 - Developer Relations
Objective | Measure of success | Status |
Goal 4: STRENGTHEN
All completed GSoC and Outreachy projects have code merged and deployed by the end of September
|
All the GSoC and Outreachy interns that pass the program in August have their code reviewed and deployed by the end of September.
|
From the 9 projects that passed the mid-term evaluation, 6 are merged and deployed, and 3 are fully functional and showcased in Labs as planned.
|
Hall of Fame: Jan Lebert & Cross-wiki watchlist tool, Sumit Asthana & Wikidata PageBanner extension, Alexander Jones & Flow support in PyWikiBot, VcamX & OAuth support in PyWikiBot, Tina Johnson & Newsletter extension, Vivek Ghaisas & SmiteSpam extension, Frédéric Bolduc & Graph for VisualEditor, Ankita-ks & Language Proofreading for VisualEditor, Dibya Singh & Translation Search.
Niharika Kohli (former intern, from India) started as stellar volunteer org admin and is now a contractor at the Community Tech team.
Frédéric Bolduc (ferdbold, from Canada) is now a contractor at the VisualEditor team.
Q1 - Developer Relations
Objective | Measure of success | Status |
Goal 5: EXPERIMENT
Establish a framework to engage with data engineers and open data organizations
|
Publication of basic documentation and community processes for open data engineers and organizations willing to contribute to Wikidata.
|
Wiki Loves Open Data offers a framework and is the result of a collaboration with the Wikidata team and community, including some chapters and projects.
|
Sylvia Ventura (Strategic Partnerships) started promising talks with World Bank, OECD, and others, but the requirement for CC0 licensing is the main obstacle for quick collaborations.
The involvement of Lydia Pintscher (Wikidata), Liam Wyatt (Europeana), Susanna Ånäs (WMFI), Yair rand (volunteer developer) and Jens Ohlig (WMDE) among others has been very valuable and puts this first step in a promising direction inspired by the GLAM precedent.
Community Resources
editQuarterly review
Key performance indicators
People supported
|
39,988
total individuals involved |
9,188 new editors
(24% of total) |
9,308 active editors
(24% of total) |
Grants to
Global South approved this Q |
Q1 - Community Resources
Objective | Measure of success | Status |
Goal 1. STRENGTHEN
Prioritize updates to funding programs in consultation with community
|
|
245 responses from 101 countries
Annual plan simple process piloton-track for 30 Sept launch |
Success: Consultation a useful first step in building alignment. Using as a model for future consultations. Planning to run survey questions again in future to track improvement on pain-points.
Learning: Offering a private space to give feedback + usual on-wiki discussion brought in many diverse and constructive perspectives. (198 survey respondents vs 34 on-wiki)
People: Big thanks to Winifred Oliff, Chris Schilling, and Edward Galvez for ensuring high participation
Learn more: Blog, Slides on key findings
Q1 - Community Resources
Objective | Measure of success | Status |
GOAL 2. STRENGTHEN
Maintain full coverage for Annual Plan (APG), Project and Event (PEG), Individual Engagement (IEG) grant program workflows
|
|
|
Learning: 75-95% of PO time is spent on these core workflows.
Q1 - Community Resources
Objective | Measure of success | Status |
Goal 3. STRENGTHEN
Develop plan to support Wikidata’s growth
|
Plan is developed with Wikimedia Deutschland and delivered to C-team to the satisfaction of ED, COO, and VP Engineering |
|
Miss: APG PO’s core workflows haven’t left sufficient time for taking on a significant extra project like this.
Learning: FTE .25-.5 is needed for managing this project.
Q1 - Community Resources
Objective | Measure of success | Status |
Goal 4. FOCUS
Implement Community Capacity Development in partnership with emerging communities
|
At least 3-4 emerging communities participate in framework discussions.
|
5 emerging communities (+2 others) engaged and indicated interest in building capacities |
Scope and plan 2 pieces of community-building work for launch in Q2 | 2 communities identified areas for pilots, but still under discussion on-wiki. Expect pilot plans to be scoped in first 2 weeks of Q2 |
Success: Strong interest from communities in building partnerships, technical, communication and conflict-resolution capacities.
Miss: Planning stage, including volunteer translation of materials, continues at community’s own pace.
Learning: Respecting community process more important than WMF timeline for co-creating workplans. In-person discussions in Ukraine helped forward on-wiki interest.
Q1 - Community Resources
Objective | Measure of success | Status |
Goal 5. EXPERIMENT
Define open innovation (IdeaLab) team based on available resources
|
JD approved and delivered to recruiting
|
Community Organizer JD delivered, candidate identified, hire in progress to lead IdeaLab campaigns |
Learning: In Resources Consultation, community ranked as #1 priorities:
- connections to others
- support for applicants
IdeaLab Community Organizer will help us provide better support in both areas.
Community Advocacy
editQuarterly review
SLA for Trust & Safety correspondence: Resolving 95% of emergency@ within three hours | 100% | +/- 0 change from sample (100%) | +/- 0 change YTD (100%) |
SLA for public correspondence: Resolving 95% of answers@ and business@ within two business days | 97% | +/- 0 change from sample (97%) | +/- 0 change YTD (97%) |
Q1 - Community Advocacy
Objective | Measure of success | Status |
Defined pathways for communication with non-Engineering teams
|
|
Objective redefined shortly after start of quarter to permit focus on shifting priorities and emerging tasks, as per instruction. CA staff continue to liaise with non-engineering departments on “as needed” basis with defined pathways but no assigned staffing. |
CA created a preliminary plan for internal consultancies, but ceased developing this project in July when instructed to focus on other tasks. This could still be developed further in future, but for now “as needed” consultancies continue. We have refined and updated our process for that on our internal wiki for staff access.
Q1 - Community Advocacy
Objective: Harassment strategy
Objective | Measure of success | Status |
Support community health through creation of a community-informed harassment strategy.
|
|
Quarterly objectives met towards this cross-quarter goal. |
CA held discussions at Wikimania, assembled small community workgroups, consulted with outside organizations, and began compiling extensive research (one, two, three) to begin preparing a survey and community consultation for Q3. Patrick and Kalli were instrumental in reaching out internally and externally to craft the consultation and survey. Their work benefitted greatly from the invaluable assistance of Edward Galvez, Abigail Ripstra and the harassment workgroup.
Q1 - Community Advocacy
Objective | Measure of success | Status |
Define and explore further ideas for scalability of global ban enforcement
|
|
Objective postponed due to shifting priorities and emerging tasks. |
Learnings: Meeting the unpredictable resourcing demands for trust & safety makes committing resources for scalability experiments currently challenging. Contractor services may be useful still in achieving this important goal in future quarters, but focus has shifted to strengthening critical trust & safety processes and policies, with an emphasis to be placed on improving efficiency later.
Q1 - Community Advocacy
Objective | Measure of success | Status |
Monitor and reach out to community on various community fora.
|
|
Objective superseded by community hub (Q2 goal) |
Learnings: Difficulties in identifying and determining staffing requirements for public channels highlighted the need for a more centralized approach, which we are seeking to explore in Q2 with a community hub project.
Q1 - Community Advocacy
Objective | Measure of success | Status |
Maintain the core.
|
|
CA met KPIs related to defined inquiry paths and maintained core workflows in spite of staffing transitions. |
Learning & Evaluation
editQuarterly Review
Key performance indicators
Resource pageviews | 61,354 | Q4 Not yet available | YoY Not yet available |
Resource page editors | 239 | +99% from Q4 | +149% YoY |
Learning Patterns created | 75 | +63% from Q4 | +97% YoY |
Community leaders engaged | 185 | not applicable | not applicable |
Q1 - Learning & Evaluation
Objective | Measure of success | Status |
Goal 1. FOCUS
Identify priority workflows and processes for project mgmt.
|
|
Complete
|
Learning: Use of the “Pixar Pitch Process” to creating the Master Project List (MPL) was effective and resulted in a more strategic approach to prioritization of staff resourcing of projects. Team members prepared a 10 minute pitch of projects with required resources and impact statements which were then challenged in a collaborative process. Pixar Pitch Process
Including community voice in the retreat incredibly valuable. To be expanded in the Annual Plan via community notes process.
Q1 - Learning & Evaluation
Objective | Measure of success | Status |
Goal 2. STRENGTHEN
Encourage and support the community to better self-evaluate
|
|
Wikimania and online engagement targets exceeded
Report releases well received in peer and community review. CCD Scoping postponed until after pilots |
Learning: Partnering with Community Leaders is key to scale and teach best and promising practices and co-author toolkits.
Decision to focus on a Train the Trainer Model and Community Knowledge Stewards. The first one pilot happened in Estonia. Thanks to Jaime Anstee, Amanda Bittaker, Maria Cruz and Community Member, Nikola Kalchev. Additional user testing on tools including translation required.
Q1 - Learning & Evaluation
Objective | Measure of success | Status |
Goal 3. EXPERIMENT
Quantify the impact of grants and community projects.
|
|
Complete
FY 13-14 Impact Analysis completed Proposal created for grantees to plan for Wikimania Scholarships
|
Successes & Learning:
-Survey Specialist, Edward Galvez has jumped into his new role with attention to streamlining foundation surveys and avoiding “Community Survey Fatigue”. Edward is also doing an inventory of all WMF survey tools, creating a survey resource center for community and WMF.
-Scoping of a solution to fix to pain of gathering Survey Metrics by volunteers and staff completed by Amanda Bittaker.
Q1 - Learning & Evaluation
Objective | Measure of success | Status |
Goal 4. MEASURE
Set-up large scale data collection system to measure community health and activities
|
|
Complete in conjunction with expanded Community Consultation.
Health Phase 1 Research Launch-DC Conference Health Clinic Wikimania Scholarship Survey postponed to 2016. |
Successes and Learnings: Haitham Shammaa is leading the research work into community health. This includes curating practices, research and initiatives across communities and by other WMF teams.
Q1 - Learning & Evaluation
Objective | Measure of success | Status |
Goal 5. CORE
Continue development of the online resources and tools, and tracking of community activities interacting with those resources.
|
|
Complete --Data inserted at the end of the quarter.
|
Success & Learning: Just in Time Video Training is important for busy volunteers. This quarter, the team launched “bite size videos” which review Wikimedia programs highlights in under 3 minutes. Look for future innovations in shared learning as we work to make program data actionable and use more video for Wikimedia Learning. https://www.youtube.com/watch?v=5ER0YCdRDyk
Communications Liaison, Maria Cruz leading both user testing of tools and exploration of best practices in community knowledge.sharing (peer to peer learning)
Wikipedia Education Program
editQuarterly review
Key performance indicator
Interactions with program leaders worldwide | 187 individuals in 61 countries | + 110% individuals from Q4
+ 53% countries from Q4 |
YoY n/a |
Q1 - CE / Education
Objective | Measure of success | Status |
Maintain the core
|
Maintain resources, tools, mentoring, support and communications of education programs worldwide (see list of 20 main workflows on office wiki page) | On track for mentoring, support and communication.
Tech tools require additional WMF support. |
Strengthen the Education Collaborative to form the frontline of education mentorship, fostering personal global relationships
|
Improve Collab model:
Start planning meeting for fall 2015:
|
On track for improvements to Collab model and membership.
On track to determine date, location and attendance criteria. |
Q1 - CE / Education
Objective | Measure of success | Status |
Strengthen Arab world education programs
|
|
|
|
In conversation with stakeholders and leaders |
Oman: Working on building a strong pilot program by connecting three different groups: government sponsors, classroom professor and community members.
Jordan: Interest by different parties to join forces, but more conversation is warranted.
Q1 - CE / Education
Objective | Measure of success | Status |
Refine data gathering efforts to produce more, better and consistent data
|
At least 10 programs report metrics | * 16 programs reported metrics for Wikimania session |
Highlights from initial data gathering efforts:
- + 12,500 students
- + 1,700 teachers
- + 178 volunteers
- + 70 universities
- + 122 secondary schools
- + 21 primary schools
- + 5 adult schools
- + 12 Wikimedia projects
- + 21 languages
- + 88,000 articles created
- + 1,500 articles translated
- + 925 articles improved
- + 4,500 files uploaded
- + 283 million bytes added
Q1 - CE / Education
Objective | Measure of success | Status |
Regional meetings as a venue for sharing experiences, improving learning and fostering personal connections.
|
Wikimania:
|
|
What we learned:
- Due to the language gap between English speakers and Spanish-only speakers and an experience gap, it was hard to keep everybody equally interested. Next time: plan ahead on dividing up the groups in smaller groups by experience level, and pre-plan different language tracks, or arrange for translation.
Wikipedia Library
editQuarterly review
Key performance indicator
Accounts distributed (total) | 4707 | +8.4% from Q4 | +45% YOY |
Global branches (total) | 11 | +37% from Q4 | +267% YOY |
Q1 - Wikipedia Library
Objective | Measure of success | Status |
GOAL 1: STRENGTHEN
Enhance editor access to research with new major partners and by extending the reach of those accounts
|
# Add 8 partners (at least 4 non-English) ✗
|
# 7 partners (4 non-English)
|
Quite good: picked up 7 partners at ALA conference including largest donation *ever* from EBSCO, not reflected in partner count metric. We have most major English publishers and global outreach is still ramping up. Can’t yet query per-user citation, our most critical performance indicator. Signup speed and more accurate metrics are our major motivators for building the Library Card Platform.
Q1 - Wikipedia Library
Objective | Measure of success | Status |
GOAL 2: FOCUS
Continue scaling the English Library model by starting-up unique, locally-run global branches
|
# Contact with 20+ interested language leaders ✓
|
# Success, robust Wikimania engagement
|
Wikimania was fantastic for building connections and momentum, but movement on branch development was greatly delayed by long summer holidays. Expect ramp-up in Q2 with focus on Spanish, Italian, Hebrew, and Dutch.
Q1 - Wikipedia Library
Objective | Measure of success | Status |
GOAL 3: FOCUS
Acts as a best practices hub by expanding and disseminating the Global Branch Project Menu
|
# Place 5 new visiting scholars and complete transition of US program to Wiki Ed ✓
|
# Successful transition to WikiEd
|
Our idea of being a clearinghouse for global Wikipedia best practices has solidified, engaging volunteers from international networks in consultation and documentation. Our high-level talks with major library IFLA (International Federation of Library Associations) and ARL (Association of research Libraries) are quickly advancing. Piloting ALISE library education reference-desk participation and reference videos project.
Q1 - Wikipedia Library
Objective | Measure of success | Status |
GOAL 4: FOCUS
Extend our network of influence with universities, libraries, consortia, publishers, and research leaders
|
# Present 2 talks and host meetup at Wikimania ✓
|
# Presented 5 talks, hosted TWL Wikimania meetup
|
Increasingly shifting our networking role towards large scale international library networks (International Librarians Network, IFLA, ARL, SPARC). Major wins in sending volunteers to conferences; we’re planning 4-affiliate attendance at Frankfurt Book Fair and volunteer attendance at Arabic Publishing Conference. Advising WMF on Sustainable Development Goals overlap with libraries network, with growing potential to collaborate with large NGOs.
Q1 - Wikipedia Library
Objective | Measure of success | Status |
GOAL 5: EXPERIMENT
Build for a more efficient, robust, inter-connected TWL platform for the future
|
# Identify technical coordinator and/or contractor ✗
|
# Call for developers was extended: 7 total applicants, 3 to be interviewed in October
|
Good progress here despite miss. We had 7 very strong applications and are interviewing 4 in early October. We received excellent consultations from Asaf, Dario, and Jon Katz with regards to the development of the Library Card Platform and mapped out a fully-featured 4-phase roadmap.
Community Liaisons
editQuarterly review
Key performance indicators:
Individual contributors with 2+ edits in product pages | Q1/J - 887
Q1/A - 894 Q1/S - 898 |
N/A from Q4 | N/A YoY |
Page Views | Q1/J - 29,887
Q1/A - 22,773 Q1/S - 21,173 |
N/A from Q4 | N/A ToY |
Q1 - Community Liaisons
Objective | Measure of success | Status |
Define and integrate community engagement process into Engineering
|
|
|
- Most CL initiatives are part of product team MPLs, and the FTEs are counted through product team line items.
- Learning: Product process and CL’s tools within it is an integrative process taking longer than anticipated. It is currently in-flight, and has been added to CL’s Q2 goals
Q1 - Community Liaisons
Objective | Measure of success | Status |
Finish launch of VE to new account holders at enwiki
|
Support VE rollout to enwiki (RfC, enwiki feedback channels, triaging requests) | Discussion at en.wp concluded with consensus to begin slow roll-out to new accounts. Initiative completed. |
- Discussion did not become a formal RfC.
- Learning: Announcing A/B announcement/testing/follow-up and results followed careful product process, which may have been helpful in holding a successful conversation.
- Sherry, Erica and Nick were integral to advising on and executing discussions around this discussion and launch.
Q1 - Community Liaisons
Objective | Measure of success | Status |
Complete Wikimania session with new ideas for community collaboration in product development
|
|
|
- Did not meet objective due to low turnout in on-wiki conversation.
- Learning: Immediate posting (prior to end of Wikimania) and more promotion of conversation online may have increased engagement in conversation.
- Requested during session were more clearer communication channels with Foundation, product prioritization inclusion, recruitment of more volunteers to help, and considering language localization whenever possible.
Q1 - Community Liaisons
Objective | Measure of success | Status |
Adoption of Tech/News into Community Liaison tasks
|
Intake of Guillaume’s weekly Tech/News, incl. any needed modifications/ adjustments | Completed intake of workflow by first week of August. |
- Tech/News is translated to 15 languages weekly, has 430 individual subscribers and 71 project page subscriptions (including en.wp’s Technical Village Pump), and is featured weekly in The Signpost.
- Johan successfully adopted weekly workflow and collaborates with tens of volunteers who help with translating and making the information accurate and accessible every week.
Q1 - Community Liaisons
Objective | Measure of success | Status |
Maintain presence in product teams that CLs are currently assigned to
|
|
|
Discovery
editQuarterly review
Key performance indicators
User satisfaction | Start Q1: -- | End Q1: 15% | -- YoY |
Zero Results Rate | Start Q1: 33% | End Q1: 33% | -- YoY |
Q1 - Discovery
Objective | Measure of success | Status |
Enhance the experience for our users that search by reducing the number of queries that return zero results.
|
Zero results rate cut in half, from 25% to 12.5%.
|
Zero results rate unchanged.
|
- Automata, like crawlers, spiders and Wikimedia bots, account for sometimes up to 30% of total search traffic with up to 80% zero results rate, and fluctuate wildly. (research)
- Action: need to represent this on our dashboard. Better infrastructure is needed. (task)
- Created A/B test infrastructure and ran around five tests on search parameters; none were better than the defaults.
- We’re trying something more radical: a complete replacement for prefix search. Work still ongoing, as the new system needs a lot of validation that it supports existing use cases.
Q1 - Discovery
Objective | Measure of success | Status |
Allow users on our cluster to run arbitrary queries on the data contained in Wikidata by deploying the Wikidata Query Service.
|
Wikidata Query Service is deployed and usable from within our cluster.
|
Launched 7th Sept 2015. |
- Usage is ~1000 SPARQL queries per day.
- What we do next is dependent on usage metrics and user input.
Q1 - Discovery
Objective | Measure of success | Status |
Allow users on our cluster to build features using maps by deploying a Maps Tile Service.
|
Wikimedia Maps Tile Service is deployed and usable from within our cluster.
|
Launched 17th Sept 2015. |
- Usage is on on our dashboards.
- What we do next is dependent on usage metrics and user input.
Q1 - Discovery
Objective | Measure of success | Status |
Further our understanding of whether our search is giving our users relevant results by finding, implementing, and deploying a quantitative metric to measure user satisfaction with search.
|
Define and communicate search satisfaction metric.
|
Launched on 30th Sept 2015. |
- Success: Public dashboarding has been a big success, very positively received.
- Learn: Metric needs qualitative validation and testing for further iteration.
- People: Oliver and Mikhail have trained other teams and organisations on analysis and dashboarding.
Reading
editQuarterly review
Key performance indicator
Global Pageviews (provisional*) | 15.3 B | -12.4% from Q4 | approx. -7% YOY |
Q1 - Reading
Objective | Measure of success | Status |
Apps:
Increase engagement via improved link preview (Android)
|
10% increase in Android app pageviews + link previews:
(Full Pageviews + TextExtracts retrievals with link preview feature) >= 1.1 × (Pageviews prior to link preview) |
Objective as stated has been achieved (increase of about 16%), but we didn’t see nearly the amount of increased engagement we were expecting in Production. |
- The Beta app should not be relied upon as a consistent indicator of user behavior in production (although the other metrics surrounding link previews are similar between beta vs. prod).
- Differences between Beta / Production tests indicate more opportunities for testing / improvements to user experience / better onboarding of users to this feature.
- Great press after strong collaboration with Communications (see appendix for details)
Q1 - Reading
Objective | Measure of success | Status |
Web:
Improve engagement via page load time decrease (mobile)
|
Time to first render on mobile does not take more time than desktop (as measured by graphite), given equal network speed
|
Objective achieved! (data in appendix). The impact was partially driven by a change made by the Performance team that mobile web was able to benefit from due to some changes made last quarter. |
- Though it is hard to verify, there is some directional evidence to suggest that increased speed led to traffic boosts. We saw a ~5-10% increase in mobile web traffic in all continents except North America, but there is no evidence that it is related.
- Ultimately it is hard to nail down the impact of changes on users without being able to measure users or sessions.
- We benefit from dashboards and need checks to prevent regressions! Already caught and reverted some site-slowing changes made by another team.
- We are working with the performance team to ensure maximum ROI on additional speed improvements.
Q1 - Reading
Objective | Measure of success | Status |
Infrastructure:
Improve MediaWiki security and extensibility by updating authentication framework
|
Creation of a metrics dashboard to track improvements to system.
|
Dashboard has been created. |
- Implementation of AuthManager is ongoing. These are developer/sys admin facing changes that will increase the configurability of the on-wiki authentication process.
- When work finishes in Q2 the WMF will be able to start planning follow on work (e.g. two-factor auth for Stewards, password hash storage and verification service).
- Graphite infrastructure largely unowned and nearing breaking point for adding new measurements
- Operational monitoring in general is an ad-hoc effort by individuals and not a core service owned by WMF teams
Advancement Team
edit
Key performance indicator
Amount Raised | $7.9 million | -$3.6 million from Q1 2014 | -$3.6 million YoY |
Advancement - Fundraising (general)
editQ1 - Advancement - Fundraising
Objective | Measure of success | Status |
FOCUS- Raise $6 million in Online campaigns and $2 million from Foundations and Major Gifts
|
Amount raised | $2.2 million raised from Major Gifts; $5.7 million raised from the online team. We ended $100K under due to moving the Italy campaign to October to support Wiki Loves Monuments. |
STRENGTHEN - Reintegrate Amazon Payments
|
Delivering a high functioning product on-time
|
Done |
EXPERIMENT - Collaborate with the Readership Team to test the use of banners to direct traffic to the app in Finland
|
# of app downloads; Learning how this converts to active users
|
Done |
OPTIONAL: Objective details (screenshots, explanations), successes and misses, learnings
Online Fundraising
editQ1 - Online Fundraising
Objective | Measure of success | Status |
2014-15 Fundraising Report
|
Report publicly posted | Donehttps://wikimediafoundation.org/wiki/2014-2015_Fundraising_Report |
Weekly banner tests | 20% improvement from July | Done |
Community & WMF campaign coordination | High quality campaigns running on the site -- with metrics and coordinated scheduling | We want to work with the community to create a more clear process. We are looking to hire someone to help. |
Test Drive ChargeBack Alert Service | Test service and assess impact | Done |
Fraud Research Project | Finding improvements on fraud filters to scale back false positives | Done & to be continued |
Fundraising Tech
editQ1 - Fundraising Tech
Objective | Measure of success | Status |
STRENGTHEN - Amazon upgrade | We do not lose Amazon as a payment processor when they deprecate our original integration in Q2. | Done |
STRENGTHEN - PCI gap analysis and Improvements | Increase our level of PCI compliance to SAQ A-EP in time to run a campaign in France in October.
|
DEFERRED (Q3) |
FOCUS - Prepare for Big English fundraiser | Complete all fundamental restructuring and initial deployment of critical components for the December fundraiser in time to begin fundraising code freeze process on October 1 | Done |
Q1 - Fundraising Tech
Objective | Measure of success | Status |
STRENGTHEN - Worldpay “Enhanced Silent Post” | Technically capable of running a campaign in France, in October, via new integration type. | Done |
STRENGTHEN - Astropay Integration | Support fundraising creative team in running a successful Brazil campaign for the first time in two years, via new payment integration. | Done |
STRENGTHEN - Hired CRM expert (contractor) | Hire and onboard a team member who is an expert in the CRM used by the online fundraising team (CiviCRM). | Done |
EXPERIMENT - Banner History project | Able to collect and analyze new information about the total banner experience, from the perspective of individual donors | In Progress |
Major Gifts & Foundations
editQ1 - Major Gifts & Foundations
Objective | Measure of success | Status |
Implement new event registration & payment system
|
System ready for use/being used | Done |
Onboard new staff | Staff up to speed and contributing at or close to 100% capacity | Done |
Complete profiles of all $10k+ donors | Profiles of all $10k+ donors created and entered into CiviCRM | In Progress |
Strategic Partnerships
editQ1 - Advancement - Strategic Partnerships
Objective | Measure of success | Status |
Goal 4. EXPERIMENT - Secure preinstall deals with a commitment to install 1 million apps; Secure one deal in the Global South
|
# of app preloads; Learning of how this converts to active users (# of sessions) | We are in process of finalizing the contract for our first app pre-install deal. |
Goal 5. FOCUS - (A) Secure at least two new Zero Rating Deals.
(B) Have our app featured by Apple, Google, and/or Amazon in their app stores.
|
Number of readers covered and pageviews resulting from the deals. Number of new app downloads when featured
|
Done.
(A) The team has secured four new Zero rating deals this quarter. (B) App was featured in Google Play’s “Back to School” promotion and they have nominated us for “New and Updated”. |
Editing
editQuarterly review
Key performance indicator (provisional metric; * – N.B. data for Q1 is for the first two months only)
Monthly active editors on all wikis | 75.2k average in Q1* | -4.7% from Q4 (78.9k) | -0.7% YoY (75.7k) |
Collaboration
editQ1 - Collaboration Team
Objective | Measure of success | Status |
Make Flow available to communities that want it, reduce deployment burden
|
Release opt-in Beta feature for users to enable/disable Flow on their user talk page
|
Launched on MediaWiki.org on 29 September, coming to various language Wikipedias in early October |
During this quarter, we manually converted on request about 90 user talk pages on French, Catalan and Hebrew Wikipedias, Wikidata, and MediaWiki.org. To satisfy the growing user demand for Flow talk pages, we released the opt-in feature, which will be enabled on wikis that want to use it.
Q1 - Collaboration Team
Objective | Measure of success | Status |
Reduce the department’s technical debt
|
Convert existing uses of LiquidThreads to Flow, where the community is willing | MediaWiki.org converted in mid-August, se.wikimedia in late September, pt.wikibooks TODO |
pt.wikibooks could not be converted due to a technical issue with Portuguese translations
Q1 - Collaboration Team
Objective | Measure of success | Status |
Align with UI standards
|
Convert common UI elements in Flow to use OOjs UI | Editor system rewritten with OOjs UI, other things converted where relevant. |
Remove urgent blocker to Operations
|
Switch Flow to work with the “External Storage” cluster’s compression needs | Collaboration Team’s script ready in early August, no further blockers. |
We were the first team to convert large, existing features to OOjs UI, instead of being written in it from the start. We learned that OOjs UI isn’t yet ready to be used on every page; trying to do so caused performance problems. We’re working with the Performance team to find a solution.
Language Team
editQ1 - Language Team
Objective | Measure of success | Status |
Move Content Translation out of beta feature for a subset of wikis.
|
In Wikipedia in at least one language Content Translation is enabled by default.
A conversion process from beta status to default status is defined. |
De-prioritised to attend to high priority bugs being reported after wider deployment last quarter. |
Wider availability surfaced several bugs and the added responsibility to ensure better uptime of the tool.
- Learning - The need to consider the follow-up work created for patrollers and support them better by generating cleaner wikitext. This would mean better handling of tags, templates etc. from within the tool.
- Learning - Ensuring reliability of the platform can be a challenge as the tool is now available to more users. Besides quick responses, we need to invest time to identify interruptions like publishing failures, monitor closely and provide long term fixes.
Q1 - Language Team
Objective | Measure of success | Status |
Engage with the translators to keep them translating helped by notifications appreciations, campaigns and article suggestions.
|
At least 33% of the users who published anything with CX, made at least 5 translations.
|
50% achieved:
✘ About 11% of users with 5+ translations ✔ 20,000+ articles created at the end of the quarter (see appendix for details) |
[[Image:]]
Article suggestions were made available towards the end of the quarter in 11 Wikipedias and it is too early to be able to measure the impact. (See image for the 1st week.)
- Learning - Cannot measure the impact of features completed late in the quarter. For Q2 we will adjust the metrics to practical sub-goals mapped to delivery schedule for features.
Q1 - Language Team
Objective | Measure of success | Status |
Translation tool enhancements for better links, reference, dictionary support and provide the parallel corpora to enhance MT engines.
|
Parallel corpora implemented, so that third party machine translation developers can use the output of users of Content Translation.
|
Deprioritized due to no immediate requests from 3rd parties and to focus on high priority bugs
✔ Increased machine translation support through Apertium for more languages |
Have an initial exploration for mobile support
|
An initial exploration plan written and reviewed. | Available at: https://www.mediawiki.org/wiki/Content_translation/Mobile_exploration |
Multimedia Team
editQ1 - Multimedia Team
Objective | Measure of success | Status |
Uploading within the visual editor
|
Users can upload files within the editor without abandoning their edit | Not completed by EOQ; done but not live by time of QR. Follow-on work forthcoming in Q2. |
Reduce performance drag of multiple technologies
|
UploadWizard is completely converted to OOUI with no loading of jQuery UI code, technical debt | Completed for main-sequence experience; one edge case tool needs a single library, for Q2. |
Graph integration within the visual editor
|
Users can modify charts from the Graph extension inside the editor
|
Completed in early September. Led to contracting the GSoC student for further work on this. |
Parsing Team
editQ1 - Parsing Team
Objective | Measure of success | Status |
Fix VE blocker bugs
|
Zero Parsoid-related VE deployment blocker bugs in Phabricator | All VE blocker bugs resolved.
Reduction in <nowiki> insertions. |
- Monitored VE feedback page and promptly addressed Parsoid-related issues.
- Promptly addressed bugs that affected VE deployment or reception.
- Strong focus on addressing <nowiki> complaints (making fixes to VE code where necessary)
- Current status: about 1 in 100 VE edits has <nowiki> added to them (for fr, it, he, en)
- # edits / day with nowiki additions
- fr: 30 → 21; it: 15 → 12; he: 8 → 4; en: 14 → 40
- fr, it, he: Noticeable reduction in # edits / day that had nowikis added
- en: Increase because of VE rollout (anecdotally, many due to use of wikitext in VE mode), but it is still 1/ 100 edits that get a <nowiki>
Q1 - Parsing Team
Objective | Measure of success | Status |
Improve parsing latency
|
Speed up PEG tokenizer by 25% | Change in parse latencies (†)
✔ mean : 0.95s → 0.81s ✔ p95 : 3.5s → 2.5s ✘ p99 : 49.5s → 52.9s PEG tokenizer is just one part of entire parse pipeline => it definitely sped up more than 25% |
Parsing latency:
- We forked an upstream library (pegjs) and improved its performance; deployed on 22 July.
- Load on Parsoid cluster depends on edit activity of templates (and can vary quite a lot at times)
† – Picked 3-week period before/after 22 July (when fix was deployed) to measure impact, but somewhat difficult to accurately correlate perf changes with deployment, because of load variability.
Q1 - Parsing Team
Objective | Measure of success | Status |
Reduce Parser : Parsoid HTML rendering diffs
|
At least 10% test pages render with pixel-perfect accuracy. (4.6% on 6/30/15)
|
✔ 16% test pages render with pixel-perfect accuracy
✘ 63% test pages render with “< 1% diffs”; lot of false positives in the other 37% |
- Fixed several bugs that brought Parsoid’s rendering closer to PHP parser’s rendering.
- Goal did not get sustained focus -- bug fixes for VE, Flow, CX often help this indirectly.
- Q4 2014/15 work on CSS-based customization of Cite helped as well.
- Worked on visual diffing infrastructure to analyze rendering differences
- Generalized it for use in other scenarios (testing correctness of the Parsoid Batching API, testing impact of replacing Tidy in core parser with HTML5 tools)
- Insufficient work on visual diffing infrastructure towards this goal
- Lot of false positives because of rendering-irrelevant pixel shifts.
- Test set very small (~750 pages) and needs to be expanded and updated.
VisualEditor Team
editQ1 - VisualEditor Team
Objective | Measure of success | Status |
Successfully complete deployment of the visual editor on the English Wikipedia
|
The visual editor is enabled for all new accounts on the English Wikipedia
|
New account availability ramp-up started post-Wikimania, reached 100% on 1 September. |
- Uptake varies widely between wikis with otherwise-identical configurations; we do not know why
- Typically 16% of article edits are made with VisualEditor on big wikis where it’s available to all
- French 18.0%, Italian 16.5%, Polish 14.3%, Russian 16.1%, Hebrew 15.2%
- Outliers: Portuguese is 34.0%; Swedish is 11.3%.
- Typically 0.7% of article edits are made with VisualEditor on big wikis where it’s not
- Spanish 0.9%, German 0.8%, Dutch 0.5%
- English is now at 3.9%, increased from ~0.6% at the start of the quarter
Numbers reflect the proportion using the visual editor out of all article edits made by IPs and accounts excluding unattended bots in the last week of September. Use of attended bots & tools not excluded.
Q1 - VisualEditor Team
Objective | Measure of success | Status |
Secure and build upon the foundational work for comprehensive mobile support
|
VisualEditor on a mobile phone secures positive feedback in pre-deployment user testing
|
Prototype found some issues in heuristic evaluation and is being tweaked before further user testing. |
Improve stability; maintain or increase test coverage
|
Code coverage is maintained at or increased from current levels.
|
Overall coverage increased from 75% to 76%; for dm, from 87% to 90%; for ce, from 66% to 67%. |
Hiring a mobile-expert engineer
|
Team has a mobile-expert engineer join, to bring the engineering team up from 3.0 to 4.0 FTE. | Our new Senior Software Engineer David Lynch started on 1 October. |
Infrastructure / CTO
editQuarterly review
Infrastructure/CTO: Overview
Infrastructure:
- ANALYTICS
- RELEASE ENGINEERING
- SERVICES
- TECHNICAL OPERATIONS
CTO:
- DESIGN RESEARCH
- RESEARCH & DATA
- PERFORMANCE
- SECURITY
Analytics
editQuarterly review
Key performance indicator
Velocity | July: 151 (MoM -32%) | August: 145 (MoM -4%) | September: 388 (MoM 167%) |
Q1 - Analytics
Objective | Measure of success | Status |
Deploy an API for pageviews in production.
|
Analytics metrics will provide data on usage of the API by the community (for example, daily queries & visitors). | Missed
The API has not been deployed yet. |
Success:
- We evaluated several storage options and decided to use Cassandra.
- We sent a survey to the analytics list and collected a comprehensive set of use cases.
- All code is ready to deploy (hadoop, restbase and puppet).
Miss:
- Reaching consensus with the Services and the Operations teams on system topology and repository structure took longer than expected.
Q1 - Analytics
Objective | Measure of success | Status |
Complete an audit of EventLogging data.
|
All EL Schemas have been reviewed, documentation has been updated and new data purging/sanitizing has been automated. | Missed
Part of data purging/sanitizing implementation is still in progress. |
Success:
- Reviewed status and privacy of 137 schemas.
- Negotiated purging strategies with 28 schema owners.
Miss:
- We didn't get enough DBA cycles to complete the database purging/sanitizing.
Q1 - Analytics
Objective | Measure of success | Status |
Publish daily pageview counts per project in Vital Signs.
|
"Pageviews" metric is available in vital-signs.wmflabs.org, using new pageview definition and on a per-project basis. | Met |
Success:
- Vital Signs graphs the new Pageview definition.
- It includes “Totals” - an aggregate of all wikis.
Q1 - Analytics
Objective | Measure of success | Status |
Migrate EventLogging to use Kafka.
|
EventLogging’s capacity increases by one order of magnitude (1k to 10K msg/s). Workers are parallelized. | Met |
Success:
- Now, one single machine can process more than 7.5k msg/s.
- EventLogging capacity scales linearly: the more machines used, the more capacity.
- If an outage in EventLogging occurs, the data is queued in Kafka (it is not lost).
Release Engineering
editQuarterly review
Key performance indicator
WMF Log Errors (open task count) | 138 | +31% from Q4 (105) | +202% YoY (68 on 2014-11-21) |
Q1 - Release Engineering
Objective | Measure of success | Status |
Isolate our Continuous Integration instances
Reduce CI wait time
|
|
|
|
|
[[Image:]]
Q1 - Release Engineering
Objective | Measure of success | Status |
Improve deployment tooling
Reduce number of deploy tools from 3 to 2
|
|
|
Q1 - Release Engineering
Objective | Measure of success | Status |
Migrate Gerrit to Differential
|
|
|
|
|
Services
editQuarterly review
Key performance indicator
REST API usage, mean req/s | 216 req/s | mean 31% up from 165 req/s Q1 |
Q1 - Services
Objective | Measure of success | Status |
Reduce app load times and duplicated development effort with an app API, providing content and metadata suitable for app consumption, backed by a service built by the app team.
|
|
- App service deployed in production.
- Public REST API deployed and documented. - Full edge caching prepared, pending format finalization. - Android app is still testing this. Current ETA for switch is end of October. IOS app to follow. |
- The content section API is also needed for progressive page loading in mobile web. We are working with the parsing and reading teams to generalize the API to work for both.
Q1 - Services
Objective | Measure of success | Status |
Add the storage and throughput we'll need to store more types of content. Establish redundancy at the DC level for site availability and disaster recovery.
|
- Expand the existing cluster by at least three new nodes.
|
- Eqiad cluster expanded from six to nine nodes.
- Added multi-DC support in RESTBase. - Six-node codfw cluster operational, using larger HW. - Replication fully operational, incl. encryption for cross-DC traffic. |
- Much of this work was done in cooperation with the operations team, especially Filippo Giunchedi. On the services side, this project was led by Eric Evans.
- Other Cassandra users (maps, analytics, possibly sessions) can reuse multi-DC support.increased density thanks to multi-instance work
Q1 - Services
Objective | Measure of success | Status |
Changes to structured data and other events need to be propagated through storage and cache layers. Our current systems are not very reliable, exclusive to MediaWiki, and don't work across projects.
We aim to make change propagation more reliable, general, and manageable for developers.
|
- Establish requirements.
|
- Requirements worked out in several tasks: T102476, T88459.
- Broad agreement on using Kafka in production. - Prototyped producer API, and established a plan for phased implementation:
|
Technical Operations
editQuarterly review
Key performance indicator
Availability | 99.942% | -0.002% from Q4 |
Q1 - TechOps
Objective | Measure of success | Status |
Focus: Reduce missing cluster dependencies in codfw data center
|
Deploy HTTPS caches in codfw, complete successful failover of eqiad caching traffic;
Deploy RESTbase with Cassandra replication; Deploy ElasticSearch cluster with replicated search indexes |
codfw HTTPS caches deployed in production, successful failover of all eqiad cache traffic performed.
RESTbase cluster in codfw set up successfully with Cassandra replication. ElasticSearch codfw cluster deployed and ready. Discovery is still finishing MediaWiki multi-DC search index support. |
Delays in the establishment of the new equipment leasing process severely impacted our hardware procurement and pushed availability of hardware to the last two weeks of the quarter.
Learning: We should make more explicit agreements on ETAs (with buffer time) for dependent work.
Q1 - TechOps
Objective | Measure of success | Status |
Strengthen: Update Wikimedia mail systems
|
Upgrade Mailman to version (2.1.18) on a supported distribution and new hardware;
Upgrade OTRS Investigate OTRS upgrade to 4.0.9 and provide trial system for OTRS users; Enable TLS encryption for inbound and outbound e-mail |
Objective was redefined early in the quarter around OTRS. A beta installation of version 4.0.13 was made available to OTRS users.
Mailman was upgraded to 2.1.18 and migrated to a new VM. TLS has been enabled on all inbound and outbound e-mail. |
Early on in the quarter we established that due to high amount of dependencies upon us, some changing circumstances (reduced DBA capacity) and shifting priorities (fr-tech), we would not be able to perform a full upgrade of OTRS this quarter. In collaboration with the CA team we decided to redefine the goal.
Learning: Migrations with a strong impact (change of functionality/use & feel) on users need more careful planning and coordination with liaison teams.
Q1 - TechOps
Objective | Measure of success | Status |
Focus: Reduce our security attack vectors
|
Implement organized package upgrades (debdeploy);
>80% of hosts protected by firewalls, or explicitly assessed as unwanted and not needed |
debdeploy has been successfully implemented and tested on a subset of cluster hosts, and we achieved 86% firewall coverage. |
860 hosts now have firewalls, and 148 have been evaluated as explicitly not needing them. 1008 out of 1176 hosts/VMs are covered, amounting to 86%.
Labs
editQ1 - TechOps
Objective | Measure of success | Status |
Strengthen: Improve reliability of Wikimedia Labs
|
Meet or exceed 99.5% uptime for each Labs infrastructure service;
Remove Labs support host SPOFs; Migrate NFS to RAID10 with sharding; Audit Labs projects on NFS dependencies and support migrating off |
Cumulative availability in Q1 was 99.742%. Redundant hosts have been set up for Labs NFS storage, networking, DNS and databases. NFS storage was migrated to RAID10 with 3 shards. 134/176 (76%) of Labs projects have been made independent of NFS storage. |
Q1 - TechOps
Objective | Measure of success | Status |
Experiment: Evaluate and test a new distributed cluster environment for Tool Labs
|
Establish evaluation criteria for cluster solutions and perform an evaluation;
Set up the selected distributed cluster environment in ToolLabs to users to experiment with their web services |
Criteria were established, and Apache Mesos and Kubernetes were evaluated.
Kubernetes was selected and made available in ToolLabs, and two Tools were migrated onto it for testing. |
Design Research
editQuarterly review
Key performance indicator
No one KPI due to challenges in quantifying qualitative research and dependencies on product teams for project work. Open to suggestions. |
Q1 - Design Research
Objective | Measure of success | Status |
Support human centered product design and development by including Design Research in teams' product development process.
|
Design Research projects are completed and output is relied upon to generate and iterate workflows, tools and products. | Completed 8 design research projects for 6 teams:
4 Generative / Exploratory 1 Usability testing 3 heuristic evaluations
|
First time/New Editor discovery research informed design of new editor education for visual editor.
Workflow research informed understanding of user workflows to iterate workflow tools.
Mobile contribution research (31:11) is the start of informing us how to design / build for mobile contributions.
Link preview usability testing informed pre release iteration of link preview.
Q1 - Design Research
Objective | Measure of success | Status |
Mentor non-design researchers to do design research to the standards of the Design Research team.
|
Two non-designers researchers have done 2 or more usability tests to the standards of the Design Research team.
|
Mentoring:
|
Link preview usability testing informed iteration of link preview before release.
Exploratory research for UI Standardization: Conversation on wiki and interviews on the same topic at Wikimania and post Wikimania are informing UI Standardization
Q1 - Design Research
Objective | Measure of success | Status |
Iterate pragmatic personas from information gathered in persona interviews.
|
12 persona interviews completed
|
|
The interviews we have done so far are already informing our thinking on the new editor persona.
Q1 - Design Research
Objective | Measure of success | Status |
Grow database of opted-in design research participants beyond 2000.
|
Database now contains over 2000 participants. | New opted-in participants came from:
|
Research and Data
editQuarterly review
Key performance indicator
No one KPI due to the nature of the work |
Q1 - Research and Data
Objective | Measure of success | Status |
Productize revscoring and wiki labels
Team members involved: 1 Collaborators: 9 |
Stable version of production-ready ORES service up and running on Labs
|
|
- revscoring makes automated edit and article quality assessment available as a service to our contributors
- at scale, revscoring can effectively reduce human curation effort by up to 93%
- 4 models in production (reverted, wp10, damaging, goodfaith), 6 languages (en, es, fa, fr, pt, tr)
- Improved AUC for enwiki (.82 → .90)
- early community adoption: revscores now integrated into top semi-automated anti-vandal tool (Huggle)
[[Image:]]
https://meta.wikimedia.org/wiki/Research:Revision_scoring_as_a_service
Q1 - Research and Data
Objective | Measure of success | Status |
Run controlled tests of article translation recommendations
Team members involved: 2Collaborators: 2 |
|
|
- Personalization is computationally expensive but matters: we can increase contributor activation rate by 82% over control
- Recs boost article creation rate: 78% with random recs and 220% with personalized recs, over control
[[Image:]]
https://meta.wikimedia.org/wiki/Research:Increasing_article_coverage
Q1 - Research and Data
Objective | Measure of success | Status |
Measuring value added
Team members involved: 1Collaborators: 1
|
|
Preliminary analysis in progress
Full study deferred to Q2 |
[[Image:]]
- Survival of content has been measured.
- The basic quality of a contribution is evident after a few edits/hours.
https://meta.wikimedia.org/wiki/Research:Measuring_value-added
Q1 - Research and Data
Objective | Measure of success | Status |
Re-train and productize article recommendations
|
|
|
- Set up a public API on Labs
- Developed an instance on Labs with article recommendation service offered for 11 language pairs.
[[Image:]]
https://meta.wikimedia.org/wiki/Research:Increasing_article_coverage
Performance
editQuarterly review
Key performance indicator
Time to first paint | 675ms | -49% from Q4 | ~ -55.73% YoY |
Q1 - Performance
Objective | Measure of success | Status |
Make editing Wikipedia fast. | Sub-second page save time.
|
Miss. We hit the goal in August, but a regression in September wiped out gains.
|
[[Image:]]
Q1 start
Regression; cause not known yet. (T114339)
Q1 - Performance
Objective | Measure of success | Status |
Faster delivery of content to readers. (T105391) | Achieve sub-900ms median first paint time. | Hit. Median first paint is now 675ms, a 49% reduction. |
[[Image:]][[Image:]][[Image:]]
Security
editQuarterly review
Key performance indicator
Critical and High Priority Security Bugs | -66.6% / +15.9% from Q4 ** |
** - Close approximation, to the extent that phabricator allows us to reconstruct history
Q1 - Security
Objective | Measure of success | Status |
Run dynamic security scanning tool against beta every week.
Team members involved: 1
|
|
Security team chose OWASP’s ZAP for scanning. Weekly scans are running from scanner.security-tools.eqiad.wmflabs. Baseline measurements are recorded at mw:Wikimedia_Security_Team/ApplicationScanning. |
Q1 - Security
Objective | Measure of success | Status |
Document and report initial metrics for security bug handling
Team members involved: 1
|
|
Until we can better understand the subtleties of our backlog, we will use the number of Critical and High priority security bugs as our KPI mw:Wikimedia_Security_Team/Metrics |
Learning: The number of open bugs is a poor metric for overall health of an application, but is the most indicative metric that we can practically track at this time.
All metrics are tracked privately. Historically, the number of open security issues in mediawiki has been considered private to the organization.
Legal Team
editQuarterly review
Q1 - Legal
Objective | Measure of success | Status |
Core
Top notch, quick legal advice and support on wide host of issues constituting our 34 legal workflows. Categories include:
|
KPIs
|
|
- Board work completed but not always on time per protocol.
Q1 - Legal
Objective | Measure of success | Status |
NSA Litigation
Protection of global users: readers and contributions
|
No missed dates for affidavits and motions. High quality documents and credible showing at hearings.
|
Remains at an early stage of litigation, but proceeding as expected:
• All motions filed on time with strong WMF research and input on opposition to gov't motion to dismiss. • Hearing held Sept. 25 in Alexandria, VA. • Work continues on time to prepare staff and expert declarations. |
Appendix A
KPI | Goal | Actual (no QoQ yet) | YoY |
Contract Turnaround | 95% w/i 7 days | 99% | YoY N/A |
Legal@ Turnaround | 95% w/i 7 days | 99% | YoY N/A |
Core legal | satisfaction of ED and C-levels | expectations met | YoY N/A |
Board Support | satisfaction of Board | deadlines did not meet expectations per Board protocol; substantive work met expectations | YoY N/A |
Talent & Culture
editQuarterly review
FQ1 - Talent & Culture
Objective | Measure of Success | Status |
Goal 1 FOCUS
Domestic PEO (for temps) replacement selection Team members involved: 3 |
-Meetings with 3 alternatives
-Recommendation done |
-Met with iWG/Upwork, PRO Unlimited, Namely
-Stay w/Upwork but have them move WMF from Coretechs to iWG |
Goal 2. - FOCUS
Process improvements in workflows for ATS Team members involved: 3 |
All recruiting and hiring workflows occur inside GreenHouse without external email approval chains | -Posting approval workflow done
-Offer approval workflow done |
Goal 3 - FOCUS
Learning and training tool with tracking and testing Team members involved: 2 |
Tool selection & implementation
5 modules in place, including: 2 Onboarding & 2 Manager |
-Mindflash selected & implemented
-5 modules in place (Legal 101, unconscious bias, constructive feedback, benefits orientation, recruiting training for HMs) |
FQ1 - Talent & Culture
Objective | Measure of Success | Status |
Goal 4 - STRENGTHEN
HRIS replacement selection Team members involved: 5 |
-Meetings with three ADP alternatives
-Recommendation done |
-Met w/Namely, Workday, Zenefits
-Recommend Namely -NOTE: To be reviewed by new VPHR to confirm proceeding |
Goal 5 - STRENGTHEN
Manager interviewing & recruiting training Team members involved: 3 |
-Deliver course material
-Integrate course material into learning tool |
-3 training sessions done
-Materials loaded on Office Wiki. -Video of session done |
Goal 6 - STRENGTHEN
Hire (replace) OD Mgr Hire (new) Coach Team members involved: 7 |
Successfully fill both positions | -On hold for VP of HR per Terry
-JDs have been posted -Interviewing |
Communications
editQuarterly review
Please see the scorecard appendices of the team’s quarterly review documentation for further information.
Q1 - Communications
Objective | Measure of success | Status |
Advance regional objectives through media promotion at Wikimania MX. Raise Wikimedia profile in Latin America.
3 FTE, 3 contractors |
|
Complete with all measures of success met. See media report. |
Q1 - Communications
Objective | Measure of success | Status |
Build public VE rollout plan and internationalized content marketing strategy for user adoption and awareness
|
|
Complete with all measures of success met. |
- In-product messaging includes revised welcome message and tooltip language
- 3 videos in user testing: How to Edit Wikipedia, How to Add Links and Citations, and The History Page
- Ongoing research into new editor experience to inform campaign
- Campaign will leverage video, social, and more to encourage/support new editors
Q1 - Communications
Objective | Measure of success | Status |
Create strategic messaging opportunity around 15th birthday to engage new Wikimedia stakeholders and audiences.
3 FTE, 3 contractors |
|
Complete with all measures of success met. |
- 21 community celebrations in 18 countries planned and counting
- Campaign launch to include community-driven announcement, influencer engagement, user-generated content, launch of microsite, digital platform engagement, and social promotion
[[Image:]]
Q1 - Communications
Objective | Measure of success | Status |
Fill critical gaps in core communications roles.
4 FTE |
|
Complete with all measures of success met. |
FTEs:
- Ed Erhart - Editorial Associate - 9/1 (est. 9/1)
- Jeff Elder - Digital Communications Manager - 9/28 (est. 8/15)
- Zack McCune - Global Audience Manager - 10/12 (est. 9/15)
Q1 - Communications
Objective | Measure of success | Status |
Timely, professional, first-rate support on core and reactive communications workflows.
4 FTE, 3 contractors |
Evaluative chart of core workflows
|
Complete with all measures of success met. |
Finance, Administration, OIT
editQuarterly review
Finance
editQ1 - Finance
Objective | Measure of success | Status |
Purchase order will be implemented and utilized by departments and teams to make purchases.
|
100% of all contract orders will have been processed via the purchase order system.
|
Project was not started, due to delays in implementing Concur Expense, which was a dependency. Also, this is put on hold until we hire a Purchasing Specialist and finalize a purchase order workflow/process.
|
Dependency on completing Concur purchase order was not clearly identified when goal was set. New projected completion date of Q3.
Q1 - Finance
Objective | Measure of success | Status |
Improve consistency in having financial data ready by the 15th of the month.
|
During the quarter financial data will be ready for input in the scorecard by the 15th of the month.
|
For each month of the quarter, financial data was ready by the 15th of the month. |
One of the key dependencies for meeting this object is the reconciliation of purchase card statements on time.
Q1 - Finance
Objective | Measure of success | Status |
Develop platform for holding scorecard data and making it accessible to managers.
Team members involved: 3
|
Test group of managers will have access to their scorecard data via an platform other than Google sheets.
|
Project was not completed due to vendor (Adaptive) inability to set up test accounts for project. |
Q1 - Finance
Objective | Measure of success | Status |
Obtain audit and tax services proposal for 3 years starting with FY15-16 from accounting firms with non-profit, technology, and international grants experience with global presence.
Team members involved: 3
|
Selection of a new Accounting Firm that meets our needs by October 31, 2015.
|
Received 9 proposals - 1 from Big 4 (KPMG) and 8 from mid-sized national accounting firms with global presence. Have narrowed down to 2 and will reach out to the references provided before recommending to our Audit Committee. |
Administration
editQ1 - Administration
Objective | Measure of success | Status |
Launch and complete RFP for real estate broker for WMF
Team members involved: 3
|
Outline success features of brokerage house and complete interview and selection process with 18 month plan drafted by 9/30/2015
|
Chose CBRE Real estate broker services out of six proposals and in depth interview process. Draft plan and workplace strategy are complete. |
Learning: Using success of prior projects; sincere, open, inclusive discovery based on human centered design principles. Separate fact (data) from opinion (narrow). Inclusion of diverse stakeholders = Clear goals, informed decisions. VITAL will continue to partner with WMF and CBRE. Director of Administration and VP of HR will work very closely on this project. Project is launching 10/8/2015 with COO and VP of HR meeting and reviewing plan with CBRE.
Q1 - Administration
Objective | Measure of success | Status |
Improve format and relevance of office wiki information
Cross org team members: 4 Community member: 1
|
Increase staff involvement by hours and number of staff collaborating and delivering on project and number of quality pages.
|
Our cross org work can be see here. OfficeWikiProject.
|
Learnings: Cross org system of design, review, support and training tested for inclusive, paced tested, successful implementation.
Q1 - Administration
Objective | Measure of success | Status |
Create best practice guidelines format
Cross org team members: 3
|
Complete Design standard format for all guidelines complete.
|
Standard format devised
Example: Mobile device guidelines Draft on wiki off site guidelines
|
Learnings: Thoughtful, open, inclusive review and input from stakeholders & users together with education from staff that have performed the work leads to greater adoption. All guidelines will continue to be revised, improved, posted and integrated into training for all new staff and managers.
Q1 - Administration
Objective | Measure of success | Status |
Create SLA for all services under management
|
Design standard format for SLA
|
Where service inventory and refinement have been done formal SLA have not been completed.
|
Due to competing priorities, transitioning of CFA as well as additional work created with Q1, this goal was worked on, but not complete.
OIT
editQ1 - OIT
Objective | Measure of success | Status |
Setup large group video conference solution.
Team members involved: 2
|
Large teams ( 25 or more) will be able to have a video conference.
|
Large teams are able to meet via video conference. |
With the implementation of this video conference solution, it was hoped that we would also have an alternate video conference solution for Metrics meetings, but testing showed that the current solution was prefered for now.
Team Practices Group
editQuarterly review
Key performance indicator
Positively impacting value delivered by supported teams | 4.2 out of 5 (Likert scale) | baseline metric |
Positively impacting sustainability of supported teams | 4.6 out of 5 (Likert scale) | baseline metric |
Q1 - Team Practices Group
Objective | Measure of success | Status |
Identify organizational pain points for software engineering and supporting teams; foster self-awareness of team health to support continual improvement
|
|
|
Q1 - Team Practices Group
Objective | Measure of success | Status |
Support the prioritization of current and upcoming work across the WMF, and balancing it against available resourcing.
|
|
Scope reduced to encompass only projects in Community Engagement and Engineering, and to not include sunset/stall plan measures of success. Engineering and Community Engagement projects now documented and up to date. |
Q1 - Team Practices Group
Objective | Measure of success | Status |
Establish TPG vision and strategy for FY16
|
Publish document outlining TPG’s high-level vision and strategy for FY16
|
|